LightPRO Shell

Research · Lightweight Structures · Natural Fibres · Pavilion

  • Type: Research demonstrator
  • Institution: BioMat / ITKE, Universität Stuttgart
  • Studio: Design and Build a Shell Construction from Natural Fibres, 5th Year (Erasmus)
  • Location: University campus, Stuttgart-Mitte
  • Year: 2021
  • Status: Built
  • Profiles team: Larisa Simion, Maysa Shaher
  • Tutors: Jun.-Prof. Dr.-Ing. M.Eng. Arch. Hanaa Dahy, Dipl.-Ing. M.Arch. Evgenia Spyridonos, Dr. Ing. arch. Jan Petrš, M.Arch Piotr Baszynski
The finished shell on the campus square in Stuttgart-Mitte, people standing under it, the university buildings behind.
The shell from the side: one membrane sail sweeping up off the timber deck, the fibre grid curving away behind it.
A detail of the membrane clipped to the outer ring profile with a steel fitting and lashing.
The shell at dusk under a pink sky, lit from within so the grid glows through the membrane.
The shell at night, the membrane glowing against a deep blue sky.
The profile labelling diagram: the shell's plan with every profile numbered along the top and bottom layers and the outer ring.
Drawings of the bending tool: the clamp in plan and section, the curve it draws, and the rail the profile is bent along.
The bending instrument built and in use: the aluminium frame, the clamp block and a profile held in the rail.

Profile labelling

Bending test design

Bending test instrument

Handwritten above the photographs: don't forget to play, with a smile after it. Under it, the team in the hall bending full-length profiles by hand to find how far each one would go.
The measured results of each bending test, drawn one under another with the radius reached by each profile.

Alternative bending tests

Bending test results

Four photographs from the start of the build: the foundation on the campus square, the profiles laid out in the workshop, and the outer ring profiles going into their foundations.

Coating OSB plates and assembling the foundation

Gluing the connection parts onto the profiles

Introducing the outer ring profiles into the foundations

Four more from the build: the outer ring standing, the grid being drawn together, one crossing lashed by hand, and the membrane pulled up to the ring.

Assembling the outer ring

Tying preliminary interior connections

Tying the connections from the inner grid

Tying the membrane to the outer ring

The pavilion team standing under the finished shell, the fibre grid and its membrane overhead.
The pavilion's own credits panel: BioMat Pavillon 2021, LightPRO Schale, Aktiv-Biege-Struktur aus Naturfasern, with the team, the partners, the participating students and the sponsors' logos.
The finished shell on the campus square in Stuttgart-Mitte, people standing under it, the university buildings behind.
The shell from the side: one membrane sail sweeping up off the timber deck, the fibre grid curving away behind it.
The shell at dusk under a pink sky, lit from within so the grid glows through the membrane.
A detail of the membrane clipped to the outer ring profile with a steel fitting and lashing.
The shell at night, the membrane glowing against a deep blue sky.
The profile labelling diagram: the shell's plan with every profile numbered along the top and bottom layers and the outer ring.

Profile labelling

Drawings of the bending tool: the clamp in plan and section, the curve it draws, and the rail the profile is bent along.

Bending test design

The bending instrument built and in use: the aluminium frame, the clamp block and a profile held in the rail.

Bending test instrument

Handwritten above the photographs: don't forget to play, with a smile after it. Under it, the team in the hall bending full-length profiles by hand to find how far each one would go.

Alternative bending tests

The measured results of each bending test, drawn one under another with the radius reached by each profile.
Coating OSB plates and assembling the foundation

Bending test results

Coating OSB plates and assembling the foundation

Gluing the connection parts onto the profiles

Gluing the connection parts onto the profiles

Introducing the outer ring profiles into the foundations
Assembling the outer ring

Introducing the outer ring profiles into the foundations

Introducing the outer ring profiles into the foundations

Assembling the outer ring

Tying preliminary interior connections

Tying preliminary interior connections

Tying the connections from the inner grid

Tying the connections from the inner grid

Tying the membrane to the outer ring

Tying the membrane to the outer ring

The pavilion team standing under the finished shell, the fibre grid and its membrane overhead.
The pavilion's own credits panel: BioMat Pavillon 2021, LightPRO Schale, Aktiv-Biege-Struktur aus Naturfasern, with the team, the partners, the participating students and the sponsors' logos.

The project focused on designing and constructing a lightweight shell structure in the form of a 1:1 research pavilion, using pultruded natural fibre profiles, a newly developed product, created by the BioMat research team, in collaboration with academic and industrial partners.

My group was in charge of profiles: we created a labelling system, did chemical and physical tests, designed and used a bending tool for more quantifiable results and organised deliveries and profile transportations. Testing, prefabrication and initial studies were done at IntCDC Workshop in Waiblingen. In the second part of the project, all students and tutors participated in the building phase and realisation of the overall structure in the university's campus in Mitte.

This project provided us with the much-needed practical knowledge of all the stages involved in creating an architectural object.